HDPE Butt Fusion End Cap for Fuel Gas

Hot Product
PE100 RC grade HDPE end cap compliant with ISO 4437 and EN 1555 standards, designed for sealing terminal points in fuel gas pipeline systems using butt fusion technology.
  • Diameter Range: 90–630 mm
  • Pressure Rating: PN10–PN16
  • Applicable Standards: ISO 4437, EN 1555, ISO 21307
  • Stock Availability: In stock
  • Sample Policy: Free sample available
  • Lead Time: 5–30 days

Need help? Contact our technical support team

+86 1551559 6408
HDPE Butt Fusion End Cap for Fuel Gas
Specifications DN Item DN L L Net Weight(Kg) Packing
63 BGMM 63 63 63 88 0.09 200
75 BGMM 75 75 70 135 0.16 50
90 BGMM 90 90 79 116 0.28 50
110 BGMM 110 110 85 138 0.44 50
125 BGMM 125 125 107 140 0.53 36
140 BGMM 140 140 85 120 0.71 36
160 BGMM 160 160 105 142 1.02 20
180 BGMM 180 180 102 147 1.42 16
200 BGMM 200 200 114 163 2 10
225 BGMM 225 225 105 162 2.39 8
250 BGMM 250 250 148 182 3.25 10
280 BGMM 280 280 134 205 4.64 5
315 BGMM 315 315 154 185 5.67 5

Key Features

  • PE100 RC material ensures resistance to slow crack growth
  • Automated butt fusion enables permanent leak-tight sealing
  • Complies with ISO 4437 hydrostatic pressure testing
  • UV stabilizers for outdoor durability

Typical Applications

  • Terminal sealing in municipal gas distribution networks
  • Maintenance isolation in LPG transmission systems
  • Pipeline termination at natural gas pressure regulating stations
  • Isolation sections in industrial gas supply systems

Manufacturing Process

Automated injection molding

  • Melt temperature control (±2°C tolerance)
  • Holding pressure >80 MPa
  • Cooling rate gradient management
  • Wall thickness uniformity (<5% deviation)

Raw Material Characteristics

  • Minimum Required Strength (MRS) 10 MPa (ISO 12162)
  • Melt Flow Rate (MFR): 0.3–0.5 g/10min (190°C/5kg)
  • Gas permeability resistance: <10 mg/m²/day (EN 1779)
  • Rapid Crack Propagation (RCP) critical pressure >1.5 MPa (S4 test)
  • Terminal sealing in new gas pipeline installations
  • Temporary isolation during pipeline maintenance
  • Downstream termination at district metering stations
  • CNG fueling station storage line termination
Request Quote

Related Products

You might also be interested in these products